Completed GiveCampus events remain active in RE NXT. This applies to both simple and complex events: moving an event from Active to Completed no longer marks its linked NXT event inactive. You do not need to keep the GiveCampus event open merely to preserve its active status in NXT.
An older completed event is already inactive
For an event affected by the previous behavior, update its status to active in RE NXT. If it cannot be updated or becomes inactive again, contact GiveCampus Support with the GiveCampus event, the linked NXT event and when the status changed. Support can inspect the particular export and help correct it.
Other event states and activities
Canceled, archived and draft events are different from completed events and can still export as inactive. Individual activities within a complex event have their own state mapping; do not assume the completed-event rule also applies to a completed activity.
The integration still synchronizes other shared event information, including names and dates/times. Keep those details correct in GiveCampus; changes made only in NXT can be overwritten by a later export.
Comments
0 comments
Please sign in to leave a comment.